Brownstone-Update 1

This slideshow requires JavaScript.

First Step-

The first step to this project was to board all the lower level windows and some of the upper windows that were missing. Most of the debris had already been removed. Akili- [The club’s President] took a week off his schedule to scrap all the loose peeling paint from all the rooms and stairwells, cleared the floors and cared for the exterior grounds.

 

 